1) All steel structural components and prefabricated dimensions of portable prefab office can be produced according to customer requirements.
2) Portable prefab office has low cost, sturdy and durable structure, convenient movement and environmental protection.
3) Portable prefab office is easy to install due to its light material. A house of 50 square meters requires 5 workers to complete the installation in 3-7 days, saving manpower and time.
4) All materials of portable prefab office can be recycled, which meets the requirements of world environmental protection.
5) We use high-quality galvanized sheets and foam materials as wall and roof materials, so portable prefab office has the advantages of fire and water resistance.
Product Price:
Our prices fluctuate with raw materials and exchange rates, please leave your contact information, we will give you the latest quotation as soon as possible.
Standard basic specification:
Here below is the standard specification of portable prefab office:
| Portable Prefab Office Specifications: | |
| size : | 6000*3000*2800mm(L*W*H) |
| steel thickness(wall/roof) : | 0.426mm |
| Wall: | 50mm z lock joined EPS sandwich panel or customized |
| Roof : | 75mm z lock joined EPS sandwich roof panel |
| Colour: | white, grey, dark gray, stone pattern, wood grain,etc as your requirement |
| Floor : | 16mm thickness fireproof mgo floor board |
| Windows and Door : | 2 pcs aluminum double safety glass sliding window: 900*910mm |
| 1 pcs panel door: 2100*950mm | |
| Interior decoration (Provided by the factory): | wall / roof / mgo floor / 2pcs aluminium windows/ with power /switch / 1pcs LED lights |
Packing and Transportation:
| Pack each part individually. |
| There is storage area for goods to be shipped.And equipped with professional loading personnel. |
| Ensure items are believer to customers in good condition. |
1.the packing way for the packing box,which need install at spot
2.the packing way for the prefabricated build container house ,which no need to install at spot
FAQ:
1.You are manufacture factory or trading company?
We are manufacture factory and you are welcomed to visit us at any time. You can enjoy the best and most competitive price.
2. Can you offer designing service?
Yes, we can design full solution drawings as your requirements by using PKPM, MTS, 3D3S,and etc.
3. What is the delivery time?
It depends on order quantities. In normal conditions, the delivery time is 30 days after receiving the deposit.
4. Can you send engineers or whole team to install my project?
We will give detailed installation drawings or videos for free. We will also send engineers as installation director or a team to install your project if you request.
5. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but also any time during the production time.
Hot Tags: portable prefab office, China, suppliers, manufacturers, factory, customized, price, for sale, modular home companies, premade homes, prefab home prices, prefab homes under 50k, modular house, prefab dome homes
Vendor Information
- Store Name: Pre Fab Housing
- Vendor: Pre Fab Housing
-
Address:
China 262406
Shandong / 山东, Weifang City, Zhuliu Street, Changle County, No.55-4 Bidewen Road - No ratings found yet!
Product Location
Changle County, Weifang, Shandong, People's Republic of ChinaFire Proof Flat Pack Container House
In stock
Mobile Shipping Container Home
In stock
Color Flat Pack Container House
In stock
*Extended Return Policy Agreement between Party A (Buyer) and Party B (Supplier) on Grooft B2B Marketplace:*
This comprehensive Return Policy establishes the terms and conditions governing returns, refunds, and dispute resolution between Party A (Buyer) and Party B (Supplier) participating in transactions on the Grooft B2B Marketplace. Both parties mutually consent to the following guidelines:
1. Reporting Damaged or Defective Goods:
– Party A is obligated to promptly report any damages or defects in the received goods within 7 days of the goods being delivered.
– Clear photographic evidence must be provided by Party A to Party B to facilitate an expeditious resolution process.
2. Reporting Quality Issues:
– In instances where the goods received by Party A are of substandard quality, Party A is required to inform Party B within 7 working days from the date of receiving the goods.
– Comprehensive documentation and evidence supporting the claim of substandard quality must be provided to Party B.
3. Late Delivery Notification:
– Party A is required to report any instances of late delivery within 24 hours of receiving the goods.
– Late delivery claims should include pertinent details such as the shipment tracking information and the anticipated and actual delivery dates.
4. Overpayment by Mistake:
– Should Party A make an overpayment or duplicate payment by mistake, Party B agrees to promptly process a refund for the excess amount.
– Both parties commit to ensuring that financial transactions are accurately documented and discrepancies are addressed in a timely manner.
5. Order Cancellations:
– Party A retains the right to cancel an order within the agreed-upon cancellation period.
– Notice of order cancellations must be provided to Party B before the order is shipped or within the stipulated cancellation timeframe.
6. Partial Shipments and Quantity Discrepancies:
– In the event of partial shipments or discrepancies in the quantity of goods received, Party A must inform Party B within 7 days of receiving the partial shipment or noting the quantity discrepancy.
7. Service-related Matters:
– If the transaction involves services, Party A should report any dissatisfaction or issues with the services provided by Party B within 7 working days of the completion of the service.
8. Financial Agreements Settled Outside Grooft B2B:
– Acknowledging that financial agreements and payment settlements may occur outside the Grooft B2B Marketplace, both parties agree that the management of Grooft B2B is not responsible for dispute resolution in such cases.
– Disputes related to financial matters settled outside the platform will be resolved directly between Party A and Party B.
9. Applicable Law:
– Both parties recognize that the laws of the respective country of residence will govern their transactions and any disputes that may arise.
– The agreement to adhere to local laws fosters a fair and equitable resolution process.
10. Mutual Agreement on Terms:
– By engaging in transactions on the Grooft B2B Marketplace, both Party A and Party B assert their understanding and acceptance of these detailed return policies.
– It is imperative for both parties to review and familiarize themselves with these terms regularly, as they are subject to updates and modifications.
This extended Return Policy Agreement aims to establish a transparent and robust framework for conducting B2B transactions, addressing various potential issues that may arise during the course of business on the Grooft B2B Marketplace.
Product Enquiry
Portable Prefab Office
- No ratings yet
- SKU:Portable Prefab Office
- 0 sold
- No ratings yet
- SKU:Portable Prefab Office
Portable Prefab Office
All steel structure components and prefabricated size can be produced according to customer requirements: the cheapest prefabricated | prefabricated
Know your supplier
CNAvg. response time
1 Hour
On time delivery rate
100%
Order Count
0
Frequently bought together
Rating and Reviews
Only logged in customers who have purchased this product may leave a review.



Reviews
Clear filtersThere are no reviews yet.